METCO delivers compliant, multi-asset microgrid packages — 48+ hours of fully islanded operation, a $500/kW grant plus forgivable loans, and a single accountable energy-engineering partner from design through commissioning.
The Texas Backup Power Package (TBPP) program funds on-site backup power at hospitals, water and wastewater plants, shelters, and emergency centers so they keep running through a grid outage. METCO is the energy-engineer of record that designs, integrates, and stands behind each multi-asset microgrid.
When Winter Storm Uri hit in 2021, millions of Texans lost power for days — and hospitals, water plants, and shelters were among the hardest hit. For a critical facility, an extended outage puts lives, operations, and community trust on the line. TBPP exists so these sites can run on their own for at least two days during an emergency, and it helps pay for the system that makes that possible.
Funding is competitive and finite. The vendor pool and application portal are expected late 2026 / early 2027, with the first awards in 2027. The advantage goes to facilities that are pre-engineered and application-ready the day the portal opens.
A critical facility applies for TBPP funding; METCO helps assemble an application-ready package and eligibility review.
A PUCT-approved vendor (METCO as engineer of record) designs and builds the islanded multi-asset system to the program standard.
The system is tested and commissioned to safely island the facility and re-synchronize when utility power returns.
The package carries critical loads for 48+ hours during an outage, with ongoing operation and maintenance.
TBPP systems are behind-the-meter, stand-alone backup power. No grid export, no wholesale/retail sales, no ancillary services, no ADER, and no non-emergency peak-shaving — the system stands ready until it’s needed.
Unlike equipment-only vendors, METCO provides single-point accountability as Engineer-of-Record and design-build EPC for the entire islanded package — electrical, mechanical, controls integration, protection coordination, and ERCOT-aware design.
Engineer-of-record and EPC for the whole system, not just a box on the diagram — one firm responsible for it working when it matters.
Solar + battery storage + on-site generation (LPG / propane / CNG) + intelligent islanding controls for superior runtime and lower fuel-logistics risk than diesel alone.
Electrical, mechanical, and plumbing engineering with protection coordination and ERCOT-aware interconnection — not off-the-shelf.
In comments on Project No. 57236, METCO argued a qualified energy-engineering firm must be involved in every package — the role we fill.
PUCT Project No. 57236 — Research Entity Final Report and stakeholder input.
PUCT Project No. 58635 — vendor-solicitation Request for Information.
PUCT Project No. 59024 / 16 TAC §25.513 — program rules, 48-hour standard.
Approved-vendor pool established and application portal opens.
Initial TBPP awards to critical facilities.
Funding is competitive and finite. We’ll pre-engineer a compliant package and get your application ready for the first 2027 awards.