Austin Energy · Commercial Solar Standard Offer Program

Turn Idle Space into Income with Solar

Lease your unused rooftops, parking lots, or land — and let solar generate guaranteed revenue for your property. METCO Engineering, Inc. is a participating contractor under Austin Energy's Commercial Solar Standard Offer Program, handling everything from design to maintenance with no upfront investment from you.

Schedule a Free Site Assessment Program Details at Austin Energy
$0.11/kWh10-yr guaranteed minimum, systems under 1 MW
$0Upfront investment required from property owners
70 MWAustin Energy's Standard Offer program target
405 MWLocal solar goal in Austin's 2035 Resource Plan
The Opportunity

What Is the Solar Standard Offer Program?

The Commercial Solar Standard Offer (CSSO) is an Austin Energy initiative that lets commercial property owners lease roof or parking space for solar — creating new revenue streams without capital investment. Energy produced feeds Austin Energy's Green-e certified Community Solar program and supports Austin's carbon-neutrality goals.

💰 Guaranteed Lease Income

Property owners receive lease payments for hosting solar on their space — "mailbox money" with no operating responsibility.

🔒 New Price Floor (2026)

Austin Energy now guarantees minimum payment rates for the first 10 years of each project: $0.11/kWh under 1 MW and $0.08/kWh over 1 MW — giving hosts and investors certainty even if avoided-cost rates fall.

🌱 Clean Energy Impact

Your property directly supports Austin's Resource, Generation & Climate Protection Plan — 405 MW of local solar by 2035.

The Structure

How It Works

Three roles make every project happen. You host — METCO and the system owner do the rest.

1

System Host — You

An Austin Energy commercial property owner willing to host a community solar project. You lease your roof, parking, or land and collect guaranteed lease income.

2

System Owner

The host or a third party that leases the space, owns the system, and is paid directly by Austin Energy at the Standard Offer rate for every kWh generated.

3

Participating Contractor — METCO

Approved by Austin Energy to design, permit, install, and maintain the system. METCO handles the entire process end to end.

The Numbers

Current Rates & Incentives

Austin Energy pays the system owner for all energy generated, and strengthened its incentives twice in 2026 — a minimum price floor announced March 31 and increased commercial incentives effective July 1.

Program / RateSystem SizeRate
Standard Offer Rider (paid per kWh generated)Under 1 MW$0.1124 / kWh
1 MW and larger$0.0841 / kWh
NEW — Guaranteed Minimum Price (first 10 years of each project)Under 1 MW$0.11 / kWh floor
Over 1 MW$0.08 / kWh floor
Commercial Capacity-Based Incentive (CBI) — increased 7/1/2026Nonprofit <200 kW
For-profit <100 kW
$1.00 / W
$0.70 / W
Commercial Performance-Based Incentive (PBI) — per kWh for 5 years, increased 7/1/2026<400 kW
400–999 kW
>1,000 kW
$0.10 / kWh
$0.08 / kWh
$0.06 / kWh

Standard Offer Rider rates per the Austin Energy Commercial Solar Program Brochure (effective 2/2025); rates update every three years based on a rolling five-year avoided-cost analysis. Minimum guaranteed price announced by Austin Energy March 31, 2026. CBI/PBI increases effective July 1, 2026. CBI and PBI apply to customer-owned commercial solar and are separate from the Standard Offer program.

⏱️

Why Timing Matters

Commercial solar projects interconnected by December 2027 qualify for current federal tax benefits — and projects establishing at least 5% of their investment by July 4, 2026 may extend completion eligibility to 2030. Acting now locks in the strongest combination of federal incentives and Austin Energy's new price floor.

Your Partner

Why METCO Engineering

METCO Engineering, Inc. is a Dallas-based design-build contractor, energy services contractor (DOE-approved ESCO), and HVAC services contractor — expert in electrical, plumbing, and mechanical engineering. Sustainability begins with Energy.

We Handle Everything

  • Site feasibility & solar design engineering
  • Austin Energy program applications & interconnection
  • Permitting with the City of Austin
  • Turn-key installation by licensed crews
  • Ongoing operations & maintenance

Approved & Qualified

  • Participating contractor under Austin Energy's Solar Programs
  • Registered City of Austin vendor & licensed TDLR electrical contractor
  • Licensed master electrician on staff
  • Fully insured to City of Austin program requirements
  • Deep Austin Energy experience — our team helped launch Austin Energy's district energy business

🏢 Flat Roofs

Warehouses, retail, offices, houses of worship — large flat roofs are ideal Standard Offer sites.

🅿️ Parking Lots

Solar canopies generate revenue while shading vehicles and improving the property.

🌾 Open Land

Fields and underutilized acreage inside Austin Energy territory can host ground-mount arrays.

Let's Set Something Up

Talk to Cliff About Your Property

A short conversation and a site review are all it takes to find out what your roof, parking lot, or land could earn under the Standard Offer program.

CB

Cliff Braddock, CEM, LEED AP

Director of Design · METCO Engineering, Inc.

Cliff brings 34 years of energy engineering experience and launched Austin Energy's multi-million-dollar district energy business — nobody knows Austin's energy landscape better. He leads METCO's Standard Offer program engagements from first site review through interconnection.

Request a Site Assessment